Bids

Procurement of Various ICT Equipment

Bid Docs - Procurement of various ICT Equipment

INVITATION TO BID FOR THE PROCUREMENT OF VARIOUS ICT EQUIPMENT

1. John Hay Management Corporation (JHMC), through the approved JHMC 2012 Corporate Operating Budget, intends to apply the sum of PhP 370,000.00, being the Approved Budget for the Contract (ABC) to payments under the contract for Procurement of Various ICT Equipment with specifications below. Bids received in excess of the ABC shall be automatically rejected during the bid opening.

Invitation to Bid

Invitation to Bid for the Procurement of Security Services

Bid Docs - Procurement of Security Services

Invitation To Bid

Procurement Of Security Services For

  1. A.           CAMP John Hay Special Economic Zone; And
  2. B.           Camp John Hay Reservation Area
    1.The JOHN HAY MANAGEMENT CORPORATION (JHMC), through its approved 2012 JHMC Corporate Operating Budget, invites Eligible Bidders to bid for the Security Services for two (2) Areas of Responsibility (AOR) under a one year term renewable annually for a maximum of 3 years subject to the result of performance evaluation, exigency of service, availability of funds, and mutual agreement of both parties, with an Approved Budget for the Contract (ABC) for the first year as follows:

Procurement of Various ICT Equipment

Bid Docs - Procurement of various ICT Equipment

INVITATION TO BID FOR THE PROCUREMENT OF VARIOUS ICT EQUIPMENT

1. John Hay Management Corporation (JHMC), through the approved JHMC 2012 Corporate Operating Budget, intends to apply the sum of PhP 370,000.00, being the Approved Budget for the Contract (ABC) to payments under the contract for Procurement of Various ICT Equipment with specifications below. Bids received in excess of the ABC shall be automatically rejected during the bid opening.

Relocation with Structure Survey and Utility Survey for the 13 Barangays within the John Hay Reservation Area

Bid Docs - Relocation with Structure and Utility Survey

The John Hay Management Corporation (JHMC), through the 2012 Corporate Budget intends to apply the sum of Three Million Pesos (3,000,000.00) being the Approved Budget for the Contract (ABC) to payments under the contract for the Relocation with Structure Survey, and Utility Survey for the Thirteen (13) Barangays within the John Hay Reservation Area (JHRA). Bids received in excess of the ABC shall be automatically rejected at the opening of the financial proposals.

Procurement of Janitorial and Gardening Services (2nd Bidding)

Bid Docs - Procurement of Janitorial and Gardening Services

The JOHN HAY MANAGEMENT CORPORATION (JHMC), through the 2012 JHMC Corporate Operating Budget, invites Eligible Bidders to bid for the following items / descriptions:

Item No. Description Approved Budget for the Contract (ABC) (Php) Cost of Bidding Documents (Php) Submission of Bidding Documents Opening of Bids
1 Procurement for Janitorial Services 750,000.00 1,500.00 April 11, 2012 at 9:30 am April 11, 2012 at 10:00 am
2 Procurement for Gardening Services 260,000.00 500.00 April 11, 2012 at 9:30 am April 11, 2012 at 2:00 pm

Bids received in excess of the ABC shall be automatically rejected at bid opening.

Procurement of 4×4 Service Vehicle

Bid Docs - Procurement of 4x4 Service Vehicle

John Hay Management Corporation (JHMC), through the approved JHMC 2012 Corporate Operating Budget, intends to apply the sum of PhP 1,400,000.00, being the Approved Budget for the Contract (ABC) to payments under the contract for Procurement of Service Vehicle with specifications below. Bids received in excess of the ABC shall be automatically rejected at bid opening.

Description : 4 x 4 M/T DSL, DOUBLE CAB

CHASSIS SPECIFICATIONS
Suspension Double Wishbone with Coil Springs/ Rigid Axle, Leaf Spring
Front/Rear Brakes Ventilated Discs / Leading Trailing Drum
Steering System Rack and Pinion with Power Assist
Tires/Wheels 265/65 R17 7.5J Alloy
Drivetrain 4x4 Auto Disconnect Differential
Engine Displacement 3.0 Liter Diesel, 4-Cylinder, 16-valve, DOHC Turbo with Intercooler
Transmission 5-Speed M/T
Vehicle Type Pickup

Procurement of Construction Services for the Maintenance and Upgrading Works at the Historical Core

Bid Documents for Download:

JOHN HAY MANAGEMENT CORPORATION through its Bids and Awards Committee (BAC) invites QUALIFIED CONTRACTORS to submit a Proposal for the following projects funded from the approved JHMC 2012 CAPEX Budget:

Project (MAINTENANCE AND UPGRADING WORKS FOR THE HISTORICAL CORE) Approved Budget for the Contract (Php) Cost of Bid Documents Project Duration (cd)
Lot 1: Bell House Maintenance and Upgrading Works 985,992.35 1,500.00 40
Lot 2: Bell Amphitheater Maintenance and Upgrading Works 400,085.78 1,000.00 30
Lot 3: Asphalt Patching at Bell House Driveway and Liberty Loop Road 467,238.18 1,000.00 6